SÃO PAULO CALLING
Tomorrow 27th january 2012 will start in Centro Cultural Sao Paulo (Brazil)” Sao Paulo Calling”a project about informal settlements, promoted by the Segretaria de Habitaçao of Sao Paulo and curated by Stefano Boeri.
The Marseille Centre Régional de la Méditerranée is taking shape.
Have a look at the last shooting session. Read More
The courtyard’s project of RCS Headquerter (building C + building A2 + building B15) is almost completed. Read More
Casa.Italo in Garibaldi Station (Milan) is going forward.
Some pictures from the construction site. Read More
Have a look at the last shooting session. Read More
Biomilano partecipated at the Beijing Design Week from 26th September till 3rd October 2011.
http://www.bjdw.org/
On Wednesday, September 15th 2011, the opening of Meet Design in Trajan Market, Rome. An initiative set up by RCS Group to promote Italian design, curated by Marco Romanelli and designed by Stefano Boeri Architteti. Read More
The Marseille Centre Régional de la Méditerranée is growing.
Have a look at the last shooting session. Read More
The Vertical Forest is growing in Milan.
Let’s have a look from different views. Read More
The Vertical Forest is growing in Milan. We are already at the seventh floor.
Let’s have a look from different views. Read More
The Marseille Centre Régional de la Méditerranée is growing.
Have a look at the last shooting session. Read More
A new book by Stefano Boeri, which brings together ideas, reflections and projects arisen from the collaboration between a number of planners, designers, artists, researchers, students and others.
The design project takes its cue from the demolition of the old Rizzoli building, creating a perfectly flat street front. On the inside, the volume has inflections that interrupt the evenness, and the tension is accentuated by the use of a completely glazed façade. Read More
Executive design is developing according to two principal directions. The individual layouts of the structures which will be used for the Casa .italo units within the stations have been reviewed and adapted. In addition, the engineering phase for the principal design elements (the high-technology wall and the circular furnishing islands) has begun. Read More