{"id":47017,"date":"2020-01-30T15:07:54","date_gmt":"2020-01-30T14:07:54","guid":{"rendered":"https:\/\/www.stefanoboeriarchitetti.net\/?p=47017"},"modified":"2020-02-03T12:38:45","modified_gmt":"2020-02-03T11:38:45","slug":"b2build-palazzo-verde-in-anversa","status":"publish","type":"post","link":"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/","title":{"rendered":"b2build | restore oxygen into the city"},"content":{"rendered":"<p>On <strong>B2BUILD<\/strong> an article that shows the developments of the first project signed by <a href=\"https:\/\/www.stefanoboeriarchitetti.net\/en\/about\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Stefano Boeri Architetti<\/strong><\/a> in Belgium, the <a href=\"https:\/\/www.stefanoboeriarchitetti.net\/en\/project\/palazzo-verde-in-antwerp\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Palazzo Verde<\/strong><\/a> of Antwerp: a new reference point for the Nieuw Zuid district, whose general plan foresees that 60% of the surface is dedicated to green areas. The attention put in the design of a livable and green roof is the core of the project, in a succession of hanging gardens, balconies and loggias capable of hosting a significant amount of trees and shrubs that return oxygen to the city.<\/p>\n<p>The public and private spaces of the Palazzo Verde merge into each other, in a succession of courtyards and terraces, respectively on the fourth, sixth and seventh floors, welcoming the planting of 86 trees, 2,200 shrubs and perennials, covering an area of \u200b\u200b430 square meters.<\/p>\n<p>Considered as inhabitants like humans, the green elements become the protagonists of a design that makes <a href=\"https:\/\/www.stefanoboeriarchitetti.net\/en\/urban-forestry\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Urban Forestry<\/strong><\/a> its aim at wider scales, of which, among others, the <a href=\"https:\/\/www.stefanoboeriarchitetti.net\/en\/project\/vertical-forest\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Vertical Forest<\/strong><\/a> of Milan is also the protagonist, the first example of colonization of the city by nature.<\/p>\n<p>To read the entire article, consult the annual B2BUILD 2019-2020.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On B2BUILD an article that shows the developments of the first project signed by Stefano Boeri Architetti in Belgium, the Palazzo Verde of Antwerp: a new reference point for the Nieuw Zuid district, whose general plan [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":47119,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[533,198],"tags":[7634,1436,2004,1555],"tag-2":[],"class_list":["post-47017","post","type-post","status-publish","format-gallery","has-post-thumbnail","hentry","category-homepage-en","category-press-release","tag-anversa-en","tag-forestazione-urbana-en","tag-palazzo-verde-en","tag-urban-forestry","post_format-post-format-gallery"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.1 (Yoast SEO v28.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>b2build | restore oxygen into the city | Stefano Boeri Architetti<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"b2build | restore oxygen into the city\" \/>\n<meta property=\"og:description\" content=\"On B2BUILD an article that shows the developments of the first project signed by Stefano Boeri Architetti in Belgium, the Palazzo Verde of Antwerp: a new reference point for the Nieuw Zuid district, whose general plan [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/\" \/>\n<meta property=\"og:site_name\" content=\"Stefano Boeri Architetti\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/StefanoBoeriArchitetti\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-01-30T14:07:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-02-03T11:38:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.stefanoboeriarchitetti.net\/wp-content\/uploads\/2020\/01\/1-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1163\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"fc_invernizzi_sba\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@boeriarchitetti\" \/>\n<meta name=\"twitter:site\" content=\"@boeriarchitetti\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"fc_invernizzi_sba\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/en\\\/press-release\\\/b2build-palazzo-verde-in-anversa\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/en\\\/press-release\\\/b2build-palazzo-verde-in-anversa\\\/\"},\"author\":{\"name\":\"fc_invernizzi_sba\",\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/#\\\/schema\\\/person\\\/a044913185177b6e14d093aff9c9bb1d\"},\"headline\":\"b2build | restore oxygen into the city\",\"datePublished\":\"2020-01-30T14:07:54+00:00\",\"dateModified\":\"2020-02-03T11:38:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/en\\\/press-release\\\/b2build-palazzo-verde-in-anversa\\\/\"},\"wordCount\":196,\"publisher\":{\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/en\\\/press-release\\\/b2build-palazzo-verde-in-anversa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/1_-2.jpg\",\"keywords\":[\"anversa\",\"forestazione urbana\",\"Palazzo Verde\",\"Urban Forestry\"],\"articleSection\":[\"Homepage en\",\"Press release\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/en\\\/press-release\\\/b2build-palazzo-verde-in-anversa\\\/\",\"url\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/en\\\/press-release\\\/b2build-palazzo-verde-in-anversa\\\/\",\"name\":\"b2build | restore oxygen into the city | Stefano Boeri Architetti\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/en\\\/press-release\\\/b2build-palazzo-verde-in-anversa\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/en\\\/press-release\\\/b2build-palazzo-verde-in-anversa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/1_-2.jpg\",\"datePublished\":\"2020-01-30T14:07:54+00:00\",\"dateModified\":\"2020-02-03T11:38:45+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/en\\\/press-release\\\/b2build-palazzo-verde-in-anversa\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/en\\\/press-release\\\/b2build-palazzo-verde-in-anversa\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/en\\\/press-release\\\/b2build-palazzo-verde-in-anversa\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/1_-2.jpg\",\"contentUrl\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/1_-2.jpg\",\"width\":1300,\"height\":730},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/en\\\/press-release\\\/b2build-palazzo-verde-in-anversa\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"b2build | restore oxygen into the city\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/#website\",\"url\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/\",\"name\":\"Stefano Boeri Architetti\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/#organization\",\"name\":\"Stefano Boeri Architetti\",\"url\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/logo-stefano-boeri-architetti.png\",\"contentUrl\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/logo-stefano-boeri-architetti.png\",\"width\":220,\"height\":200,\"caption\":\"Stefano Boeri Architetti\"},\"image\":{\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/StefanoBoeriArchitetti\\\/\",\"https:\\\/\\\/x.com\\\/boeriarchitetti\",\"https:\\\/\\\/www.instagram.com\\\/stefanoboeriarchitetti\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/sba_-stefano-boeri-architetti\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.stefanoboeriarchitetti.net\\\/#\\\/schema\\\/person\\\/a044913185177b6e14d093aff9c9bb1d\",\"name\":\"fc_invernizzi_sba\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9a49a67371c87db1a600f0a07cf0785477f4d6177a74d287fa1f163d96cb056e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9a49a67371c87db1a600f0a07cf0785477f4d6177a74d287fa1f163d96cb056e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9a49a67371c87db1a600f0a07cf0785477f4d6177a74d287fa1f163d96cb056e?s=96&d=mm&r=g\",\"caption\":\"fc_invernizzi_sba\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"b2build | restore oxygen into the city | Stefano Boeri Architetti","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/","og_locale":"en_US","og_type":"article","og_title":"b2build | restore oxygen into the city","og_description":"On B2BUILD an article that shows the developments of the first project signed by Stefano Boeri Architetti in Belgium, the Palazzo Verde of Antwerp: a new reference point for the Nieuw Zuid district, whose general plan [&hellip;]","og_url":"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/","og_site_name":"Stefano Boeri Architetti","article_publisher":"https:\/\/www.facebook.com\/StefanoBoeriArchitetti\/","article_published_time":"2020-01-30T14:07:54+00:00","article_modified_time":"2020-02-03T11:38:45+00:00","og_image":[{"width":2048,"height":1163,"url":"https:\/\/www.stefanoboeriarchitetti.net\/wp-content\/uploads\/2020\/01\/1-1.jpg","type":"image\/jpeg"}],"author":"fc_invernizzi_sba","twitter_card":"summary_large_image","twitter_creator":"@boeriarchitetti","twitter_site":"@boeriarchitetti","twitter_misc":{"Written by":"fc_invernizzi_sba","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/#article","isPartOf":{"@id":"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/"},"author":{"name":"fc_invernizzi_sba","@id":"https:\/\/www.stefanoboeriarchitetti.net\/#\/schema\/person\/a044913185177b6e14d093aff9c9bb1d"},"headline":"b2build | restore oxygen into the city","datePublished":"2020-01-30T14:07:54+00:00","dateModified":"2020-02-03T11:38:45+00:00","mainEntityOfPage":{"@id":"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/"},"wordCount":196,"publisher":{"@id":"https:\/\/www.stefanoboeriarchitetti.net\/#organization"},"image":{"@id":"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/#primaryimage"},"thumbnailUrl":"https:\/\/www.stefanoboeriarchitetti.net\/wp-content\/uploads\/2020\/01\/1_-2.jpg","keywords":["anversa","forestazione urbana","Palazzo Verde","Urban Forestry"],"articleSection":["Homepage en","Press release"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/","url":"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/","name":"b2build | restore oxygen into the city | Stefano Boeri Architetti","isPartOf":{"@id":"https:\/\/www.stefanoboeriarchitetti.net\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/#primaryimage"},"image":{"@id":"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/#primaryimage"},"thumbnailUrl":"https:\/\/www.stefanoboeriarchitetti.net\/wp-content\/uploads\/2020\/01\/1_-2.jpg","datePublished":"2020-01-30T14:07:54+00:00","dateModified":"2020-02-03T11:38:45+00:00","breadcrumb":{"@id":"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/#primaryimage","url":"https:\/\/www.stefanoboeriarchitetti.net\/wp-content\/uploads\/2020\/01\/1_-2.jpg","contentUrl":"https:\/\/www.stefanoboeriarchitetti.net\/wp-content\/uploads\/2020\/01\/1_-2.jpg","width":1300,"height":730},{"@type":"BreadcrumbList","@id":"https:\/\/www.stefanoboeriarchitetti.net\/en\/press-release\/b2build-palazzo-verde-in-anversa\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.stefanoboeriarchitetti.net\/en\/"},{"@type":"ListItem","position":2,"name":"b2build | restore oxygen into the city"}]},{"@type":"WebSite","@id":"https:\/\/www.stefanoboeriarchitetti.net\/#website","url":"https:\/\/www.stefanoboeriarchitetti.net\/","name":"Stefano Boeri Architetti","description":"","publisher":{"@id":"https:\/\/www.stefanoboeriarchitetti.net\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.stefanoboeriarchitetti.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.stefanoboeriarchitetti.net\/#organization","name":"Stefano Boeri Architetti","url":"https:\/\/www.stefanoboeriarchitetti.net\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.stefanoboeriarchitetti.net\/#\/schema\/logo\/image\/","url":"https:\/\/www.stefanoboeriarchitetti.net\/wp-content\/uploads\/2017\/09\/logo-stefano-boeri-architetti.png","contentUrl":"https:\/\/www.stefanoboeriarchitetti.net\/wp-content\/uploads\/2017\/09\/logo-stefano-boeri-architetti.png","width":220,"height":200,"caption":"Stefano Boeri Architetti"},"image":{"@id":"https:\/\/www.stefanoboeriarchitetti.net\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/StefanoBoeriArchitetti\/","https:\/\/x.com\/boeriarchitetti","https:\/\/www.instagram.com\/stefanoboeriarchitetti\/","https:\/\/www.linkedin.com\/company\/sba_-stefano-boeri-architetti"]},{"@type":"Person","@id":"https:\/\/www.stefanoboeriarchitetti.net\/#\/schema\/person\/a044913185177b6e14d093aff9c9bb1d","name":"fc_invernizzi_sba","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9a49a67371c87db1a600f0a07cf0785477f4d6177a74d287fa1f163d96cb056e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9a49a67371c87db1a600f0a07cf0785477f4d6177a74d287fa1f163d96cb056e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9a49a67371c87db1a600f0a07cf0785477f4d6177a74d287fa1f163d96cb056e?s=96&d=mm&r=g","caption":"fc_invernizzi_sba"}}]}},"_links":{"self":[{"href":"https:\/\/www.stefanoboeriarchitetti.net\/en\/wp-json\/wp\/v2\/posts\/47017","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.stefanoboeriarchitetti.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.stefanoboeriarchitetti.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.stefanoboeriarchitetti.net\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.stefanoboeriarchitetti.net\/en\/wp-json\/wp\/v2\/comments?post=47017"}],"version-history":[{"count":3,"href":"https:\/\/www.stefanoboeriarchitetti.net\/en\/wp-json\/wp\/v2\/posts\/47017\/revisions"}],"predecessor-version":[{"id":47125,"href":"https:\/\/www.stefanoboeriarchitetti.net\/en\/wp-json\/wp\/v2\/posts\/47017\/revisions\/47125"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.stefanoboeriarchitetti.net\/en\/wp-json\/wp\/v2\/media\/47119"}],"wp:attachment":[{"href":"https:\/\/www.stefanoboeriarchitetti.net\/en\/wp-json\/wp\/v2\/media?parent=47017"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.stefanoboeriarchitetti.net\/en\/wp-json\/wp\/v2\/categories?post=47017"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.stefanoboeriarchitetti.net\/en\/wp-json\/wp\/v2\/tags?post=47017"},{"taxonomy":"tag-2","embeddable":true,"href":"https:\/\/www.stefanoboeriarchitetti.net\/en\/wp-json\/wp\/v2\/tag-2?post=47017"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}