Project for the new Epano Skala Harbour in MytileneEpano scala sull’isola di Mitilene

March 22, 1997

The building of a breakwater was the first step in planning. The breakwater is not simply a technical feature to protect the bay from the waves; it becomes a lived-in facility that can be walked along.
A walkway across the width of the construction, flanked by two walls ,leads to the arch at its extremity. The slope of the walkway varies, and hence the height of the wall changes as one walks along it.

Project information

location: Mitilene, Greece
commission: Strategic Plan
year: 1997
client: Heracles (Italcementi goup)
built area:
budget:

Architectural Design:
BOERI STUDIO (Stefano Boeri, Gianandrea Barreca, Giovanni La Varra)
Team:
La costruzione di una diga è il primo passo del piano.
La diga non è semplicemente un’infrastruttura di protezione della baia dalle onde ma diventa un elemento del paesaggio, una struttura architettonica lungo la quale si può camminare. Su di essa è posizionata una passerella appoggiata ai fianchi della diga e protetta, in tutta la sua lunghezza, da due muri continui. All’interno di questo percorso la percezione del paesaggio marino e la vista verso l’esterno varia continuamente al variare della pendenza della passerella.

Informazioni progetto

Luogo: Metilene, Grecia
Incarico: Piano Strategico
Anno: 1997
Committente: Heracles (Italcementi group)
Superficie costruita:
Importo:
Progetto architettonico:

BOERI STUDIO (Stefano Boeri, Gianandrea Barreca, Giovanni La Varra)
Team:

Leave a Comment

You must be logged in to post a comment.